April 8th, 2009 - Improvements to Lupine
Ahhh, Spring is here. It was a long winter, but soon we'll be back
up at Pemaquid Beach. The water gets turned on May 1st and the rental
season should be in full swing by Memorial Day. We're going to
head up to New Harbor next week to spend a couple of days working on
Lupine. The bedrooms need some sprucing up. Our plan is to remove the
old wallpaper, spackle and repaint the walls. Then we'll rip up the
linoleum floor and reveal the beautiful wide pines that are underneath.
We'll probably do one room at a time just in case we run out of time. Also,
Jim Dance is going to be putting in a new door in the master bedroom
that goes out onto the deck. The old wood door is falling apart. We'll
get a nice full view door, hopefully with a build in shade so that the
light can be filtered out when people are sleeping. Also, we're
planning on installing a glass shower door in the downstairs bathroom.
I think it will look so much nicer and will prevent any water issues
that arise from the shower curtain not being tucked in. We'll try to post photos of our progress next week. Posted by Laura 4/8/09 7:05 AM

|